网格化规划系统中电气计算核心算法的实现
|
|
迟福建, 孙阔, 张章, 张媛, 吴倩
|
Implementation of Core Algorithm of Electrical Calculation in Grid Planning System
|
|
Fujian CHI, Kuo SUN, Zhang ZHANG, Yuan ZHANG, Qian WU
|
|
表1 潮流临时节点
|
Tab. 1 Power flow temporary nodes
|
|
| 本节点ID | 总节点数 | 上一节点ID | 下一节点ID | 节点有功功率/kW | 节点无功功率/(kV⋅A) | 电流有功分量/A | 电流无功分量/A | 短路电阻/Ω | 短路电抗/Ω | 节点电压/kV |
|---|
| 1 | 1 | 0 | 2 | 3 170.4 | 746.23 | 316.72(3) | 74.55(3) | 31.60 | 134.27 | 10.01(1) | | 2 | 3 | 1 | 3, 4 | 2 000.7 | 470.92 | 199.87(3) | 47.04(3) | 50.08 | 212.78 | 10.01(4) | | 3 | 3 | 2 | 5, 6 | 776.3 | 182.72 | 77.71(3) | 18.29(3) | 128.56 | 546.19 | 9.99(4) | | 4 | 2 | 2 | 8 | 445.9 | 104.95 | 44.63(3) | 10.51(3) | 223.82 | 950.89 | 9.99(4) | | 5 | 2 | 3 | 7 | 301.5 | 70.97 | 30.18(3) | 7.10(3) | 331.01 | 1 406.31 | 9.99(4) | | 6 | 1 | 3 | — | 289.1 | 68.05 | 28.97(2) | 6.82(2) | 344.52 | 1 463.70 | 9.98(4) | | 7 | 1 | 5 | — | 230.9 | 54.35 | 23.14(2) | 5.45(2) | 431.36 | 1 832.63 | 9.98(4) | | 8 | 1 | 4 | — | 170.4 | 40.11 | 17.07(2) | 4.02(2) | 584.51 | 2 483.31 | 9.98(4) |
|
|
|