网格化规划系统中电气计算核心算法的实现
迟福建, 孙阔, 张章, 张媛, 吴倩

Implementation of Core Algorithm of Electrical Calculation in Grid Planning System
Fujian CHI, Kuo SUN, Zhang ZHANG, Yuan ZHANG, Qian WU
表1 潮流临时节点
Tab. 1 Power flow temporary nodes
本节点ID总节点数上一节点ID下一节点ID节点有功功率/kW节点无功功率/(kV⋅A)电流有功分量/A电流无功分量/A短路电阻/Ω短路电抗/Ω节点电压/kV
11023 170.4746.23316.72(3)74.55(3)31.60134.2710.01(1)
2313, 42 000.7470.92199.87(3)47.04(3)50.08212.7810.01(4)
3325, 6776.3182.7277.71(3)18.29(3)128.56546.199.99(4)
4228445.9104.9544.63(3)10.51(3)223.82950.899.99(4)
5237301.570.9730.18(3)7.10(3)331.011 406.319.99(4)
613289.168.0528.97(2)6.82(2)344.521 463.709.98(4)
715230.954.3523.14(2)5.45(2)431.361 832.639.98(4)
814170.440.1117.07(2)4.02(2)584.512 483.319.98(4)